Office Move IT Checklist: Eight Weeks Out to Day One

Bundle of network cables
The quick answer

Start office move IT planning eight weeks ahead. Order internet first because it has the longest lead time, schedule phone number porting, get cabling in before move week, take a tested backup, and move over a weekend with a technician on site the first morning.

  • Internet installs are the most common reason moves go wrong.
  • Port phone numbers on a scheduled date.
  • Label every device with its new location.
  • Movers move boxes. Someone needs to own the IT.

The move timeline

WhenWhat to do
8 weeks beforeWalk the new space, order internet, plan the network
6 weeks beforeSchedule phone porting, plan cabling and power
4 weeks beforeCabling installed and tested, network closet ready
2 weeks beforeFirewall, switches, Wi-Fi and phones installed
1 week beforeInventory and label devices, full tested backup
Move weekendDisconnect, pack, move, reconnect and test
MondayTechnician on site for the first morning

Typical lead times to plan around

Business internetUp to 8 weeks
Phone number porting2 to 3 weeks
Cabling install1 to 2 weeks
Network and Wi-Fi setupAbout 1 week
Typical lead times. Internet installs in new buildings can take longer.

Internet first

Business internet installs, especially fibre to a new building, can take weeks. Order as soon as the lease is signed and confirm the install date in writing. Where uptime matters, order a backup connection from a different provider.

Phone numbers

Moving to a new address may mean moving phone service. Schedule porting for the move weekend and keep the old service live until the port completes. Update 911 civic addresses for VoIP lines.

Cabling and the network closet

Plan drops for every desk, printer, camera, access point and meeting room screen. Get cabling in before furniture arrives. Make sure the closet has power, ventilation and space for a rack and UPS.

Move weekend checklist

  1. Friday evening. Final backup, shut down systems in order, disconnect and label.
  2. Pack sensitive gear yourself. Servers, firewalls and switches should not travel loose in a truck.
  3. Saturday. Install network gear, power up servers, connect desks.
  4. Sunday. Test every desk, printer, phone and the internet.
  5. Monday. A technician on site to handle anything missed.

Leaving the old site

  • Remove all equipment and cabling you own.
  • Wipe or destroy drives in anything left behind.
  • Return keys, fobs and access cards.
  • Cancel old internet and phone services after the move.

Quick answers

How far ahead should we plan IT for an office move?

Eight weeks is ideal. Internet lead times are usually the limit.

Should we move over a weekend?

Yes, if you can. It gives a full day to test before staff arrive.

Can we reuse our old network equipment?

Often. It is also a good time to replace old switches and Wi-Fi.

Who should be responsible for IT during the move?

One person or provider who owns the whole IT plan.

Moving offices?

We handle the internet, phones, cabling, packing and Monday morning, so your team can just show up.

Need a hand?

Talk to a real technician.

Text a photo for a repair price, or book a free IT assessment for your business. Shop at 546 Boler Rd, London.

Keep reading

More guides.