Empty space to working office.
Cabling, network, Wi-Fi, phones, computers, printers, cameras and door access, planned together with one point of contact instead of five vendors blaming each other.
When should IT be planned?
Before the walls close. Cable runs, power and access point positions are simple to plan during construction and costly to add afterwards. Business internet can take weeks to install, so we order it early enough to be live on day one.
Walkthrough to move in.
Walkthrough
We visit the space or review drawings with your contractor.
Design
Cable drops, rack, Wi-Fi, phones and security on one plan.
Build
Cabling, network, Wi-Fi and devices installed and tested.
Move in
On site the first morning while people settle in.
Your new office, connected.
Planned before move in, tested before your first morning.
Everything a new office needs.
Business internet
Ordered early, with a backup line where uptime matters.
Firewall
Secure internet edge with remote access for staff.
Network cabling
Drops for desks, printers, cameras and access points.
Network closet
Rack, patch panel, switch and UPS.
Wi-Fi
Designed from a survey, with a separate guest network.
Workstations
Desks set up, monitors and docks connected.
Printers and scanners
Networked, with scan to email.
Phones
VoIP handsets or Teams calling.
Cameras and door access
Entrances, reception and stock.
Meeting rooms
Screens and video conferencing.
When to start each piece.
| When | What happens |
|---|---|
| 8 to 12 weeks before | Walkthrough, design and internet ordered |
| 6 to 8 weeks before | Cabling and power planned with your contractor |
| 4 to 6 weeks before | Cabling installed before ceilings and walls close |
| 2 weeks before | Network, Wi-Fi and phones installed and tested |
| Move week | Workstations set up, everything tested |
| First morning | A technician on site |
New office IT, explained.

Order internet first
Business internet can take weeks to install, especially fibre to a new building. It is the one thing that cannot be rushed, so we order it at the start.
Plan cabling before construction ends
Running cable while ceilings are open is fast and tidy. Running it after walls are finished costs more and looks worse. We work with your contractor so drops are in the right places.
Leave room to grow
We plan extra drops, switch ports and rack space for the staff you will hire in the next few years.
One point of contact
Internet, cabling, Wi-Fi, phones, cameras and computers handled by one team, so nothing falls between vendors.
Can you work with our general contractor?
Yes. We coordinate with your contractor and electrician on cabling and power.
Do you do small offices?
Yes, from a three desk office to multiple floors.
Can you reuse our existing equipment?
Where it is in good shape, yes. We tell you what is worth moving.
Do you provide a fixed quote?
Yes. Projects are quoted once, with the scope written down.
Plan it with us before the walls close.
Moving into a new space?
Three desks or three floors. Tell us the address and the date.