Cabling at row scale.
Planned pathways, correct lengths, clean cable management, and every link tested and labelled. Poor cabling blocks airflow, hides faults and turns every change into an outage risk.
Pathways
Overhead or underfloor, planned first.
Trunks and panels
Copper and fibre trunks and patch panels.
No coiled slack
Correct lengths, managed horizontally and vertically.
Tested and labelled
Results supplied, labels to your standard.
From the core to every server.
Permanent links between panels, short patches for daily changes.
Copper, fibre and direct attach.
| Cabling | Typical use |
|---|---|
| Cat6A copper | Management networks, out of band and 10 gigabit to servers |
| OM4 multimode fibre | High speed links within a row or room |
| OS2 single mode fibre | Longer runs, between rooms, floors and to carriers |
| MPO or MTP trunks | High density fibre between racks and patching zones |
| DAC and AOC cables | Short high speed links within a rack |
Top of rack or end of row?
Top of rack
A switch in each rack, short cables to servers and fewer long runs. Common in modern builds.
End or middle of row
Switching in dedicated racks, with structured runs to each server rack. Fewer switches to manage.
Patching zones
Fibre and copper terminated in patch panels so changes never touch permanent cabling.
How we cable.
Labelled both ends
To your scheme, matching the port map.
Tested
Copper certified, fibre tested and recorded.
Bend radius respected
Fibre routed so it is never kinked.
Overhead or underfloor pathways
Trays and ladders, never loose bundles.
Colour coding
By network, if your standard uses it.
As built documentation
Port maps and test results handed over.
Planned, pulled, proven.
Survey
Pathways, rack positions and port counts.
Design
Media, lengths, panels and labels.
Install
Cables pulled, terminated and dressed.
Test and document
Results and port maps delivered.
Data centre cabling, explained.

Permanent links versus patching
Structured cabling separates permanent runs between panels from the short patch cables you change every day. It means moves and changes are fast and the backbone stays untouched.
Why testing matters
A cable that looks fine can still fail at high speeds. Testing every copper and fibre link and keeping the results means problems are found before go live, not during it.
Cleaning up existing cabling
We can untangle, re route and label existing racks in planned windows, one rack at a time.
Do you supply the cable and panels?
Yes, or we install materials you provide.
Can you match our labelling standard?
Yes. Send it and we follow it exactly.
Do you do office cabling too?
Yes. See network cabling.
Can you work in live environments?
Yes, carefully, in approved windows.
Racks, rows, runs.
Tell us the scope and the facility.
Most repairs done in under an hour
Free IT assessment
Talk to a real person