Server room with cable trays
With a rollback path

Move it without losing it.

Server room to colocation, one facility to another, or a reshuffle within a hall. Inventoried, planned, moved in a window and proved working.

Inventory

Every device, cable and dependency recorded, backups verified.

Design

New elevations, power and cabling planned; destination pre cabled.

Move

Shut down, transport, rack and power up in an agreed order and window.

Prove

Tested with your team, rollback kept until you sign off.

Step by step

How a migration flows.

1

Discover

Inventory and dependencies.

2

Plan

Racks, cabling and cutover.

3

Pre build

Destination ready and tested.

4

Move

Hardware moved in groups.

5

Verify

Services tested, documented.

Migration types

What kind of move is it?

TypeWhat it involves
Physical moveExisting hardware moved to a new rack, room or facility
Hardware refreshOld gear replaced with new, data and services moved across
Colocation to colocationMoving between providers, often across a cutover weekend
On site server room to colocationMoving out of the office into a proper facility
Partial move to cloudSome workloads to the cloud, the rest to new racks
Phases

Planned before anything moves.

Discover

Inventory, dependencies, power and network needs.

Plan

Rack design, cabling, move groups and a cutover plan.

Move

Hardware moved in groups during agreed windows.

Verify

Services tested, documentation updated, old site cleared.

Cutover plan

What goes in the cutover plan.

Move groups

Which systems move together, in what order.

Timeline

Step by step, with owners.

Shutdown order

Applications, then servers, then storage and network.

Transport

Packing, labelling and handling.

Power on order

The reverse, with checks at each step.

Test plan

How each service is confirmed working.

Rollback

What we do if something does not come back.

Communication

Who gets updated and when.

Risks

What can go wrong, and how we prevent it.

01

Hidden dependencies

Discovered during planning, not on move night.

02

Hardware that does not restart

Spare parts and vendor support lined up in advance.

03

Cabling surprises

New racks pre cabled and tested before the move.

04

Overruns

Tested timings and a rollback point.

In depth

Migrations, explained.

Data centre aisle

Pre build the destination

The fastest migrations happen when the new racks are already built, powered and cabled before move night. Then hardware just slides into tested positions.

Back up and verify first

Every migration starts with fresh, tested backups of everything that moves.

Questions

Migration questions.

Not covered here? Call or text (226) 756-0139.

How long does a migration take?

Small moves can happen in one night. Larger ones are staged over several windows.

Can you move equipment between cities?

Yes, with proper packing and transport.

Do you handle the network changes?

We coordinate with your network team or carrier, and can do the cabling and patching.

What happens to the old site?

We can decommission it properly. See decommissioning.

Migration

From where, to where?

Both locations, rack count and your window.

A technician replies within one business day. No contract, no sales pressure.