Technician holding network cables
One plan, one contact

Empty space to working office.

Cabling, network, Wi-Fi, phones, computers, printers, cameras and door access, planned together with one point of contact instead of five vendors blaming each other.

The short answer

When should IT be planned?

Before the walls close. Cable runs, power and access point positions are simple to plan during construction and costly to add afterwards. Business internet can take weeks to install, so we order it early enough to be live on day one.

How a build out runs

Walkthrough to move in.

Walkthrough

We visit the space or review drawings with your contractor.

Design

Cable drops, rack, Wi-Fi, phones and security on one plan.

Build

Cabling, network, Wi-Fi and devices installed and tested.

Move in

On site the first morning while people settle in.

How it connects

Your new office, connected.

Planned before move in, tested before your first morning.

InternetBusiness lineBackup lineCellular failoverFirewallSecure edgeSwitchPoE, labelledWi-Fi access pointsStaff and guestsComputersWired desksPrintersScan to emailPhonesVoIP or TeamsCamerasPoE, own network
Checklist

Everything a new office needs.

Business internet

Ordered early, with a backup line where uptime matters.

Firewall

Secure internet edge with remote access for staff.

Network cabling

Drops for desks, printers, cameras and access points.

Network closet

Rack, patch panel, switch and UPS.

Wi-Fi

Designed from a survey, with a separate guest network.

Workstations

Desks set up, monitors and docks connected.

Printers and scanners

Networked, with scan to email.

Phones

VoIP handsets or Teams calling.

Cameras and door access

Entrances, reception and stock.

Meeting rooms

Screens and video conferencing.

Timeline

When to start each piece.

WhenWhat happens
8 to 12 weeks beforeWalkthrough, design and internet ordered
6 to 8 weeks beforeCabling and power planned with your contractor
4 to 6 weeks beforeCabling installed before ceilings and walls close
2 weeks beforeNetwork, Wi-Fi and phones installed and tested
Move weekWorkstations set up, everything tested
First morningA technician on site
In depth

New office IT, explained.

Office with glass walled rooms

Order internet first

Business internet can take weeks to install, especially fibre to a new building. It is the one thing that cannot be rushed, so we order it at the start.

Plan cabling before construction ends

Running cable while ceilings are open is fast and tidy. Running it after walls are finished costs more and looks worse. We work with your contractor so drops are in the right places.

Leave room to grow

We plan extra drops, switch ports and rack space for the staff you will hire in the next few years.

One point of contact

Internet, cabling, Wi-Fi, phones, cameras and computers handled by one team, so nothing falls between vendors.

Questions

New office questions.

Not covered here? Call or text (226) 756-0139.

Can you work with our general contractor?

Yes. We coordinate with your contractor and electrician on cabling and power.

Do you do small offices?

Yes, from a three desk office to multiple floors.

Can you reuse our existing equipment?

Where it is in good shape, yes. We tell you what is worth moving.

Do you provide a fixed quote?

Yes. Projects are quoted once, with the scope written down.

Moving into a new space?

Plan it with us before the walls close.

Book a walkthrough →
New office

Moving into a new space?

Three desks or three floors. Tell us the address and the date.

A technician replies within one business day. No contract, no sales pressure.